Cooling tower for cooling water tank – Tucuman Plant
- Multidisciplinary detail engineering development for the installation of a new cooling tower in Tucuman Plant.
- Flowsheets and P&Ids design, process description.
- General Layout, new equipments specification and data sheet.
- Piping routing.
- Isometrics. Mechanical materials list.
- Mounting specification.
- Concrete and structure calculation reports.
- Bars list and MTO. Civil plans.
- Civil work specifications.
- Cables calculation.
- Load list.
- Grounding design, cable routing and lightning.
- Instruments data sheets, MTO, cable routing, loop diagrams and existing control system upgrade.
- Construction cost estimate.
- Tender documents preparation for construction bidding process.