Cooling tower for cooling water tank – Tucuman Plant

  • Multidisciplinary detail engineering development for the installation of a new cooling tower in Tucuman Plant.
  • Flowsheets and P&Ids design, process description.
  • General Layout, new equipments specification and data sheet.
  • Piping routing.
  • Isometrics. Mechanical materials list.
  • Mounting specification.
  • Concrete and structure calculation reports.
  • Bars list and MTO. Civil plans.
  • Civil work specifications.
  • Cables calculation.
  • Load list.
  • Grounding design, cable routing and lightning.
  • Instruments data sheets, MTO, cable routing, loop diagrams and existing control system upgrade.
  • Construction cost estimate.
  • Tender documents preparation for construction bidding process.