Heap Leach – Phase 3: Detail Engineering and Coordination. Detail engineering development for crushing, pump and irrigation areas. Covering all the disciplines involved in engineering: Process, Civil, Instrumentation, Electrical and Mechanical. It is important...
Heap Leach – Phase 1: Feasibility upgrade. Final Feasibility Report upgrade and its presentation in front of the Steering Committee, Heap Leach Project Feasibility Study documentation.
DCP Water Recovery System Full project area topographic survey. Multidisciplinary Detail Engineering design for process water recovery system optimization.
Feeding of Pebbles in Grinding Plant installations survey including topography of the site. Detail engineering development of the Pebbles Grinding Feed System for Bajo La Alumbrera Concentrator Plant.
Underground Advice to the Underground Project Team for Pre-feasibility report preparation, documents development to continue the Feasibility phase and its submission to the Project Steering Committee of Anglogold Ashanti.