Firefighting system – Pilar Plant

  • Phase 1 and 2 Conceptual Engineering development.
  • Investment cost estimate.
  • Basic and detail engineering development.
  • Purchasing management for construction.
  • Construction management, including pre-assembled in workshop.
  • As-built documents.