Technical assistance and construction management / Engineering design
- On-site supervision of removal and assembly projects in different sectors of the company´s plants in Argentina.
- At the same time, the following projects were developed in our technical office:
- Malta Negra Plant moving: Technical specifications development to move all the installations from Quilmes Plant to Zárate Plant of Malta Negra line process.
- Zárate metering station and fermenter: Instruments basic engineering design and metering stations and fermenter technical specifcations.
- Bulk beer loading and unloading: Electrical detail engineering design, Electrical and Instruments mounting for bulk beer loading and unloading plant expansion, materials supply, instruments calibration and start-up.
- Caustic soda tank moving: Electrical and instrumentation detail engineering for the moving project (equipments, electric panels, pumps and instruments in Quilmes Plant).
- Diagnostic service and Coriolis Flowmeters configuration.
- Maltose syrup reception: Electrical and Instrumentation engineering design on PROFIBUS and ASI bus. Electrical Tracing and power board mounting.