Water wells – Quilmes Plant
- Construction cost estimate, technical specifications, single line diagrams, redesign, supports, Detail Engineering, MTO and equipment list.
- On-site survey and enginnering documents study.
- Electrical accesories cost study.
- Civil work cost estimate.
- Calculation reports.
- Cable routing.
- On-site technical support, instrument leader.
- Electrical and mechanical assembly management.
- Tangential filtration.