Sewage treatment plant – San Juan Plant
- BWTP Preliminary studies, including on-site surveys to verify current plant installations and utilities capability.
- Survey monitoring and soil sampling to do the soil study.
- Sewer drainage ducts verification and redesign.
- A compact sewage treatment plant technical specification.
- Multidisciplinary engineering development for bidding.
- Cost evaluation and technical documents development for bidding.